Nova continues to refine and develop methods and procedures to efficiently control time and cost from planning through construction for successful project completion.

Claims management
Construction engineering and inspection
Cost estimating
Document control
Office engineering
Project/contract administration
Project controls
Resident engineering
Scheduling
Shop drawing review


Representative Projects

Government Cut Utility Relocation Projects
Miami, FL

Nova was part of the construction management and inspection on this design/build project that involved two pipeline relocations; a 54-inch wastewater force main installed under Government Cut channel via micro-tunnel trenchless technology, and a 20-inch water main underneath Fisherman’s Channel. The new deeper water and wastewater mains allows for the dredging of the shipping channel into the Port of Miami to accommodate the larger “Post-Panamx” ships.
CM_GovtCut2-1-small CM_GovtCut2-2-small CM_GovtCut-3-small

Total Residual Chlorine Management Program
New York, NY

As part of New York City Department of Environmental Protection’s $47 million total residual chlorine program, Nova is providing project controls and scheduling for the upgrade of the disinfection and/or installation of dechlorinatiuon facilities at the Port Richmond, North River, and Coney Island wastewater treatment plants.